For a 38 MW power plant with a biomass steam boiler we delivered the full cycle: software development for the Simatic S7-1500 PLC and Siemens WinCC operator station, commissioning and operation support.
We configured boiler control, pressure and temperature protection, coordination with heat demand, archiving and operator display.
The solution ensured stable generation and reliable operation of the energy center.
Software development for Simatic S7-1500 PLC and Siemens WinCC operator station, commissioning and operation support of the biomass steam boiler of a 38 MW power plant.