Projects
Automation of a 38 MW biomass power plant
Simatic S7-1500 PLC and WinCC operator station for a 38 MW power plant with a biomass steam boiler, full commissioning and support scope.
MDF line automation: software, thermal oil and control cabinet
Simatic S7-1500 PLC and WinCC for an MDF line, thermal oil heating of dryer air, supply of a control cabinet for the heat exchanger.
Plywood plant automation: production line and energy center
Commissioning of the process control for plywood line equipment and the energy center (thermal oil and hot water boilers) on Simatic S7-1500.
MDF line automation: thermal oil boiler, dryer, pneumatic transport
Commissioning of the process control for an MDF line: 60 MW biomass thermal oil boiler, dryer, extraction and pneumatic transport.
OSB production automation: energy center, dryer, forming station
Upgrade and commissioning of the process control for an OSB line: biomass energy center, drum dryer, forming station, on Simatic S7-317.
Technical audit of a port handling complex control system
Technical audit of the control system of a specialised handling complex: wagon tipper, wagon positioner, crusher, feeders, conveyors, stacker.