The new energy center will begin its work soon.

Working process

We have obtained a license to operate with power plants. All necessary documents weresigned and handed over to the customer. The equipment was adapted taking into account the features of the mode and load.

Autonomy and cost reduction

Your own energy center will allow you to get autonomy: independence from the general grid. Money spent on equipment will fully pay off and electricity will be much cheaper.

Do not forget about such thing as a sudden tariff increase. The energy center excludes such surprises.

 

High efficiency

The new power plant will not only supply energy to the production line, but also generate heat for facility heating. This will reduce heating costs. In addition, the equipment has a low level of noise and vibration.

Follow our interesting articles
and news

We will answer your questions as soon as possible
Consultation is free